Cheng-Chi Bridge Reconstruction Project Over the Keelong River

  • Client

    Division of New Construction Projects Taipei City Government

  • Architect / Engineer

    China Engineering Consultants, Inc.

  • Location

    Keelong River (near Nanking E. Rd., Sec. 5)

  • Year of Completion

    2000

  • Structure

    Foundations & Columns (only both river side) are R.C
    Columns (others) & arch-bridge are steel structure
    Use fixed gantry skid derrick method to fitting-up the block beams
    Total weight of steel material: 11,862T.

  • Type of Work

    Double decks single tired arch bridge
    Arch rise 50m, arch span 170m, total length 340m
    Upper-deck one way two lanes
    Lower-deck one way three lanes