Mass Rapid Transit System Project No. CD550 Panchiao/Tucheng Line Systemwide

  • Client

    Central District Project office DORTS,TCG

  • Architect / Engineer

    China Engineering Consultants, Inc.
    Sinotect Engineering Consultants, Ltd.
    CTCI Corporation, E&C Engineering Corporation

  • Year of Completion

    2007

  • Type of Work

    Civil/Architectural works:
    Two underground RC stations, steel structure Depot and three tunnels which have been constructed by TBM method and cut & cover method.

    Facility E/M:
    Services for Stations, Tunnels and Depot including Water supply and Lighting systems, Fire fighting / Alarm system, Low voltage Distribution system.
    Environment Control System including Tunnel ventilation, Air conditioned system

    Track Works:
    Running tracks: Total length 25km
    Third rail installation: Total length 27km

    System wide E/M:
    EMU (6 trains / 36 cars), Signaling, Power supply, Communications, Escalators, Elevators, Automatic Fare Collection, Depot Equipment