Projects

Bridge and Road

Taiwan High Speed Rail Project Contract C270

  • Client

    Taiwan High Speed Rail Corporation

  • Architect / Engineer

    B+B Design Team, Sinotech & Maunsell Ltd.

  • Location

    From North Shore of Choshue River TK207K+015 to North Taipao of Chiayi County TK249K+814, total length 42,799m in Yunlin and Chiayi County

  • Year of Completion

    2004

  • Structure

    Pile foundation substructure and prestressed concrete box girder superstructure with simple support for standard viaduct and continuous for non-standard bridge.

  • Type of Work

    42km High Speed Rail Elevated BridgeConstruction Method includes:
    Full Span Precast Launching method (Mainly), Segmental(in-situ) balanced cantilever, construction,Site shoring Steel composite bridge.

  • appended fileG
    1c260_c270.pdf

    download Adobe PDF Reader

The Holding Company

Member Companies