Projects

Bridge and Road

Liantang/Heung Yuen Wai Boundary Control Point ˇVSite Formation and Infrastructure Works- Contract 6

  • Client

    Civil Engineering and Development Department

  • Architect / Engineer

    AECOM Asia Co. Ltd.

  • Location

    Hong Kong, New Territories

  • Year of Completion

    2018

  • Type of Work

    The works include construction of a 4.6 km long dual two-lane trunk road (with about 0.6km at grade roads, 3.3km viaducts and a 0.7km tunnel) connecting Sha Tau Kok Road Interchange to BCP, and the associated environmental mitigation measures, landscaping, drainage/sewerage, waterworks and utilities works.
    The tunnel will be excavated by drill & blast method. Large diameter concrete bored piles will be adopted as the foundation of the viaducts, while using the pre-cast segmental method to erect the prestressed box girder of the viaducts.