Civil Engineering
Taipei MRT Neihu Line Contract CB420
- Project Type
- MRT System
- Location
- Zhongshan District, Taipei
- Year
- 2008
Architect / Supervising Engineer
Desgin: CECI Engineering Consultants, Inc.
Supervision: East District Project Office, Department of Rapid Transit Systems,
Taipei City Government
Client
East District Project Office, Department of Rapid Transit Systems,
Taipei City Government
Structure
Station and shield tunnels
Scope of Work
- Station: Two-story MRT underground station, 163 m in length x 22 m in width
- Tunnel: Twin-bored tunnel with inner diameter of 5.6 m with RC segment thickness of 25 cm, total length of up & down tracks is 5,901 m
Highlights
The station was constructed by the Cut & Cover method
The tunnel adopts the pre-cast R. C. ring shield tunnel and Cut & Cover method