Taipei Songshan Airport & Fuxing North Road Underpass

Project Type
Tunnel & Underpass
Location
Songshan District, Taipei City
Year
2007

Architect / Supervising Engineer

Moh and Associates, Inc.

Client

New Construction Bureau, Public Works Department,
Taipei City Government

Structure

Reinforced concrete (RC)

Scope of Work

  1. The project is located on Fuxing North Road of Taipei City, from Minzu East Road to Binjiang street, with a total length of 600 m.
  2. Tunnel: Double passage underpass with an inner width of 22.2 m, an inner height of 7.8 m and a total length of about 600 m.

Highlights

This project is located under the runway of Songshan Airport. It adopts ESA with Front Jacking Method combined with Pipe Roof Method. It is the world’s first underground tunnel project successfully completed across the runway while the airport is still in operation.