Skip to content

Civil Engineering

National Highway No. 1 Yuanshan Bridge

Project Type
Bridge & Road
Location
Zhongshang District, Taipei City
Year
1977

Architect / Supervising Engineer

T. Y. Lin International Taiwan Inc.

Client

Taiwan Area National Freeway Bureau

Structure

Reinforced concrete (RC)

Scope of Work

  1. The viaduct adopted prestressed concrete cantilever construction method, with a bridge length of 1,452 m and a bridge width of 35 m.
  2. The main span of the bridge is 150 m, and the length of the north and south approach bridges are 525 m and 256 m respectively.

Related Projects

You are now opening an external address

The website information you will be accessing is provided by another organization or vendor. Please press Continue to go to

CEC 80th Anniversary

CEC 80th Logo

CEC was founded in 1945, a challenging time full of uncertainty. Through eight decades of change, CEC has navigated the challenges of each era, always seeking opportunities to break through and progress further. As we enter this next chapter, we return to our founding aspiration – to remember why we began, and to know how we shall move forward. To embody this aspiration, we deliberately made our corporate identity understated. It serves as a reminder that our legacy is not about resting on past success, but about continuing to create value for our clients and societies and moving forward.


Our founding aspiration— roots us in times of change, nurtures our values and sustains our growth, lights the path ahead and fuels the will to move forward.


CEC Line pattern