Skip to content

Civil Engineering

Taipower Linkou Thermal Power Plant Retrofit Turnkey Project

Project Type
Others (Civil)
Location
Linkou District, New Taipei City
Year
2016

Architect / Supervising Engineer

CTCI Corporation

Client

CTCI Corporation

Structure

Main plant: Reinforced concrete (RC)

Scope of Work

  1. Civil works of 2 main plants for power generating equipment (block size about 97 m length * 50 m width * 40 m height each)
  2. Water looping channels, cable ducts, roads and facilities for instrument control & electrical equipment

Related Projects

You are now opening an external address

The website information you will be accessing is provided by another organization or vendor. Please press Continue to go to

CEC 80th Anniversary

CEC 80th Logo

CEC was founded in 1945, a challenging time full of uncertainty. Through eight decades of change, CEC has navigated the challenges of each era, always seeking opportunities to break through and progress further. As we enter this next chapter, we return to our founding aspiration – to remember why we began, and to know how we shall move forward. To embody this aspiration, we deliberately made our corporate identity understated. It serves as a reminder that our legacy is not about resting on past success, but about continuing to create value for our clients and societies and moving forward.


Our founding aspiration— roots us in times of change, nurtures our values and sustains our growth, lights the path ahead and fuels the will to move forward.


CEC Line pattern