Skip to content

Civil Engineering

Taoyuan International Airport MRT Extension to Zhongli Contract CM01

Project Type
MRT System
Location
Zhongli District, Taoyuan City
Year
2029

Architect / Supervising Engineer

CECI Engineering Consultants, Inc.

Client

Northern Region Engineering Office, Railway Bureau, MOTC

Scope of Work

1. Underground MRT stations, shield tunnels, MEP, elevator & escalator, building management system and track work
2. Station:Two underground stations (A22、A23). Crossovers and cut-and-cover structures
3. Tunnel:There are 4 shield tunnels in two sections. The inner diameter of the tunnel is 5.60 m, the segment thickness = 25 cm, and the total length of the tunnel is 3,201 m

Highlights

shield tunnels and cut & cover structures

Related Projects

You are now opening an external address

The website information you will be accessing is provided by another organization or vendor. Please press Continue to go to

CEC 80th Anniversary

CEC 80th Logo

CEC was founded in 1945, a challenging time full of uncertainty. Through eight decades of change, CEC has navigated the challenges of each era, always seeking opportunities to break through and progress further. As we enter this next chapter, we return to our founding aspiration – to remember why we began, and to know how we shall move forward. To embody this aspiration, we deliberately made our corporate identity understated. It serves as a reminder that our legacy is not about resting on past success, but about continuing to create value for our clients and societies and moving forward.


Our founding aspiration— roots us in times of change, nurtures our values and sustains our growth, lights the path ahead and fuels the will to move forward.


CEC Line pattern