Taoyuan International Airport MRT Extension to Zhongli Contract CM01
- Project Type
- MRT System
- Location
- Zhongli District, Taoyuan City
- Year
- 2029
Architect / Supervising Engineer
CECI Engineering Consultants, Inc.
Client
Northern Region Engineering Office, Railway Bureau, MOTC
Scope of Work
1. Underground MRT stations, shield tunnels, MEP, elevator & escalator, building management system and track work
2. Station:Two underground stations (A22、A23). Crossovers and cut-and-cover structures
3. Tunnel:There are 4 shield tunnels in two sections. The inner diameter of the tunnel is 5.60 m, the segment thickness = 25 cm, and the total length of the tunnel is 3,201 m
Highlights
shield tunnels and cut & cover structures