Civil Engineering
Delhi Metro Phase-III Mukund Pur – Yamuna Vihar Corridor Contract CC-04
- Project Type
 - MRT System
 - Location
 - New Delhi
 - Year
 - 2015
 
                    Architect / Supervising Engineer
Geodata Engineering S. P. A
Client
Delhi Metro Rail Corporation Ltd.
                                
                                Scope of work
- Underground section between Mukundpur Station (excluded) and Shalimar Bagh station (excluded) line chainage 110 m to 3,685 m
 - Design and construction of tunnel by shield TBM
 - Design and construction of tunnel by Cut & Cover
 - Cut & Cover Underground Station at Azadpur
 - Ramps at Mukund Pur and Shalimar Bagh for underground works
 
Highlights
Station: Cut & Cover method
Tunnel: Cut & Cover/TBM
                                
                                Related Projects
                        
                        Taipei MRT Circular Line Contract CF670
MRT System