Civil Engineering
Delhi Metro Phase-III Mukund Pur – Yamuna Vihar Corridor Contract CC-04
- Project Type
- MRT System
- Location
- New Delhi
- Year
- 2015
Architect / Supervising Engineer
Geodata Engineering S. P. A
Client
Delhi Metro Rail Corporation Ltd.
Scope of work
- Underground section between Mukundpur Station (excluded) and Shalimar Bagh station (excluded) line chainage 110 m to 3,685 m
- Design and construction of tunnel by shield TBM
- Design and construction of tunnel by Cut & Cover
- Cut & Cover Underground Station at Azadpur
- Ramps at Mukund Pur and Shalimar Bagh for underground works
Highlights
Station: Cut & Cover method
Tunnel: Cut & Cover/TBM