Da-an Shield Tunnels Turnkey Project

Project Type
Tunnel & Underpass
Location
Taipei City
Year
2025

Architect / Supervising Engineer

CECI Engineering Consultants Inc.

Client

Taiwan Power Company

Scope of Work

  1. Cable shield tunnel, open cut culvert, vertical shaft, cooling mechanical room and other civil and mechanical/electrical ancillary works
  2. The length with 5.5 m inner diameter of the shield tunnel is 966 m long, while the length of 4.6 m inner diameter is 4,639m long; 3 vertical shafts and 1 cooling mechanical room