East-West Expressway Kaohsiung-Chaozhou Line Contracts E802~E806

Project Type
Bridge & Road
Location
Kaohsiung City
Year
2004

Architect / Supervising Engineer

Design: Excel Engineers & Consultant. Co.
Supervision: Southern Region Construction Offic, Directorate General of Highways,
Ministry of Transportation and Telecommunications

Client

Southern Region Construction Office, Directorate General of Highways,
Ministry of Transportation and Telecommunications

Structure

Reinforced Concrete (RC)

Scope of Work

  1. This project starts from the east of Zhongshan Expressway in the west to about 1.5 km in front of Wanda Bridge, with a total length of 8.45 km.
  2. The total length of the viaduct is 8.45 km, which is divided into two parts: pre-casting section and cast-in-situ section.
  3. The main bridge adopts precast segmental cantilever launching method.