Civil Engineering
East-West Expressway Kaohsiung-Chaozhou Line Contracts E802~E806
- Project Type
- Bridge & Road
- Location
- Kaohsiung City
- Year
- 2004
Architect / Supervising Engineer
Design: Excel Engineers & Consultant. Co.
Supervision: Southern Region Construction Offic, Directorate General of Highways,
Ministry of Transportation and Telecommunications
Client
Southern Region Construction Office, Directorate General of Highways,
Ministry of Transportation and Telecommunications
Structure
Reinforced Concrete (RC)
Scope of Work
- This project starts from the east of Zhongshan Expressway in the west to about 1.5 km in front of Wanda Bridge, with a total length of 8.45 km.
- The total length of the viaduct is 8.45 km, which is divided into two parts: pre-casting section and cast-in-situ section.
- The main bridge adopts precast segmental cantilever launching method.