East-West Expressway Taixi-Gukeng Line Contract E507

Project Type
Bridge & Road
Location
Dapi Township and Dounan Town, Yunlin County
Year
2002

Architect / Supervising Engineer

Design: Sinotech Engineering Consultants, Ltd.
Supervision: Join Engineering Consultants, Ltd.

Client

Southern Region Construction Office for the East-West Expressway,
Directorate General of Highways, Ministry of Transportation and Telecommunications

Scope of Work

The length of the bridge is 2.1 km, the cantilever method was adopted for crossing Zhongshan Freeway; the cast-in-situ bridge, PCI and steel structure method were adopted for the rest of the bridge construction.