East-West Expressway Taixi-Gukeng Line Contract E507
- Project Type
- Bridge & Road
- Location
- Dapi Township and Dounan Town, Yunlin County
- Year
- 2002

Architect / Supervising Engineer
Design: Sinotech Engineering Consultants, Ltd.
Supervision: Join Engineering Consultants, Ltd.
Client
Southern Region Construction Office for the East-West Expressway,
Directorate General of Highways, Ministry of Transportation and Telecommunications


Scope of Work
The length of the bridge is 2.1 km, the cantilever method was adopted for crossing Zhongshan Freeway; the cast-in-situ bridge, PCI and steel structure method were adopted for the rest of the bridge construction.