Skip to content

Civil Engineering

Liantang/Heung Yuen Wai Boundary Control Point – Contract 6

Project Type
Bridge & Road
Location
New Territories
Year
2018

Architect / Supervising Engineer

Supervision: AECOM Asia Co. , Ltd.

Client

Civil Engineering and Development Department, the Government of the Hong Kong Special Administrative Region

Scope of Work

The works include construction of a 4.6 km long dual two-lane trunk road (with about 0.6 km at grade roads, 3.3 km viaducts and a 0.7 km tunnel) connecting Sha Tau Kok Road Interchange to BCP, and the associated environmental mitigation measures, landscaping, drainage/sewerage, waterworks and utilities works.

The tunnel was excavated by drill & blast method. Large diameter concrete bored piles was adopted as the foundation of the viaducts, while using the pre-cast segmental method to erect the prestressed box girder of the viaducts.

Related Projects

You are now opening an external address

The website information you will be accessing is provided by another organization or vendor. Please press Continue to go to

CEC 80th Anniversary

CEC 80th Logo

CEC was founded in 1945, a challenging time full of uncertainty. Through eight decades of change, CEC has navigated the challenges of each era, always seeking opportunities to break through and progress further. As we enter this next chapter, we return to our founding aspiration – to remember why we began, and to know how we shall move forward. To embody this aspiration, we deliberately made our corporate identity understated. It serves as a reminder that our legacy is not about resting on past success, but about continuing to create value for our clients and societies and moving forward.


Our founding aspiration— roots us in times of change, nurtures our values and sustains our growth, lights the path ahead and fuels the will to move forward.


CEC Line pattern