Skip to content

Civil Engineering

Tainan Railway Underground Project Contract C211

Project Type
Tunnel & Underpass
Location
North District, Tanan City
Year
2025

Architect / Supervising Engineer

Design & Supervision: CECI Engineering Consultants Inc.

Client

Southern Region Engineering Branch Office, Railway Bureau,
Ministry of Transportation and Communications

Structure

  1. Cut & Cover tunnel: RC structure
  2. Water, electrical and environmental works
  3. Temporary steel bridge crossing railway at Changrong Road

Scope of Work

The scope of this project is from the south end of Tainan Daqiao Station to the vicinity of Xiaodong Road underpass, with a total length of about 2,170 m.

  1. The main structure of the tunnel: the Cut & Cover tunnel (the main tunnel is 1,550 m, the approach tunnel is 150 m, and the length of the at-grade section is about 470 m) whose total length is about 2,170 m.
  2. Water, electrical and environmental works: pumping machinery room, tunnel ventilation shaft, emergency exit, sign niche, approach road and cut and cover tunnel fire protection and lighting

Related Projects

You are now opening an external address

The website information you will be accessing is provided by another organization or vendor. Please press Continue to go to

CEC 80th Anniversary

CEC 80th Logo

CEC was founded in 1945, a challenging time full of uncertainty. Through eight decades of change, CEC has navigated the challenges of each era, always seeking opportunities to break through and progress further. As we enter this next chapter, we return to our founding aspiration – to remember why we began, and to know how we shall move forward. To embody this aspiration, we deliberately made our corporate identity understated. It serves as a reminder that our legacy is not about resting on past success, but about continuing to create value for our clients and societies and moving forward.


Our founding aspiration— roots us in times of change, nurtures our values and sustains our growth, lights the path ahead and fuels the will to move forward.


CEC Line pattern