Structure

  1. Cut & Cover tunnel: RC structure
  2. Water, electrical and environmental works
  3. Temporary steel bridge crossing railway at Changrong Road

Scope of Work

The scope of this project is from the south end of Tainan Daqiao Station to the vicinity of Xiaodong Road underpass, with a total length of about 2,170 m.

  1. The main structure of the tunnel: the Cut & Cover tunnel (the main tunnel is 1,550 m, the approach tunnel is 150 m, and the length of the at-grade section is about 470 m) whose total length is about 2,170 m.
  2. Water, electrical and environmental works: pumping machinery room, tunnel ventilation shaft, emergency exit, sign niche, approach road and cut and cover tunnel fire protection and lighting