Taipei MRT Banqiao Line Contract CP261

Project Type
MRT System
Location
Wanhua District, Taipei City
Year
1999

Architect / Supervising Engineer

De Leuw Cather International, Inc.
Sinotech Engineering Consultants, Inc.

Client

Central District Project Office, Department of Mass Rapid Transit System,
Taipei City Government

Structure

Reinforced concrete (RC)

Scope of Work

  1. Station: Longshan Temple Station
  2. The total length of the shield tunnel is 3,297 m

Highlights

The station is constructed by Cut & Cover semi-top down method
The tunnel is constructed by soil pressure balance type TBM