![](https://www.continental-engineering.com/app/uploads/2024/03/中壢車站2.jpg)
Civil Engineering
Taipei MRT Circular Line Contract CF670A
- Project Type
- MRT System
- Location
- Wenshan District, Taipei City
- Year
- 2032
![](https://www.continental-engineering.com/app/uploads/2023/12/CF670A_1.1.png)
Architect / Supervising Engineer
Design: CECI Engineering Consultants Inc.
Supervision: The 10th Site Office, Second District Project Office, Department of Rapid Transit Systems, Taipei City Government
Client
Second District Project Office, Department of Rapid Transit Systems,
Taipei City Government
![](https://www.continental-engineering.com/app/uploads/2023/12/CF670A_3.1.png)
Structure
- Underground MRT station
- Shield tunnel
- Water, power and environmental work
Scope of Work
CF671
- Y01 station (underground 2-story island platform station with a length of 223m), Y1A station (underground 4-story island platform station with a length of 99m)
- Shield tunnel (Y01~Y1A/937m, Y1A~Y2A/940m)
CF624H
- Water, power, and environmental works for station facilities and shield tunnel section
Related Projects
![](https://www.continental-engineering.com/app/uploads/2024/03/中壢車站2.jpg)
![](https://www.continental-engineering.com/app/uploads/2022/09/DJI_0075-tuned.jpg)
Kai Tak Development-Stage 2 Infrastructure Works
Bridge & Road
![](https://www.continental-engineering.com/app/uploads/2022/09/tuned-Bridge-D-near-BCP_03.jpg)