Taiwan High Speed Rail Project Contract C260

Project Type
Bridge & Road
Location
Changhua County
Year
2004

Architect / Supervising Engineer

BB Engineering, Sinotech Engineering Consultants Ltd. , Maunsell Consultants Asia Ltd.

Client

Taiwan High Speed Rail Corporation

Structure

Reinforced concrete (RC)

Scope of Work

  1. The project starts from Changhua County Fenyuan Township in the north and reaches Xizhou Township in the south, with a total length of 35 km.
  2. Bridge: 25.2 km viaduct
  3. Tunnels: The total length of seven tunnels is 9.41 km

Highlights

  1. The New Austria Tunneling Method (NATM) is adopted for all tunnel projects, including the Baguashan tunnel, which is the longest in the HSR project at 7,360 m.
  2. Bridge construction method: Full Span Precast Launching method (Mainly), balanced cantilever (FCC), precast segmental launching Method, cast-in-situ

Related Projects

You are now opening an external address

The website information you will be accessing is provided by another organization or vendor. Please press Continue to go to

CEC 80th Anniversary

CEC 80th Logo

CEC was founded in 1945, a challenging time full of uncertainty. Through eight decades of change, CEC has navigated the challenges of each era, always seeking opportunities to break through and progress further. As we enter this next chapter, we return to our founding aspiration – to remember why we began, and to know how we shall move forward. To embody this aspiration, we deliberately made our corporate identity understated. It serves as a reminder that our legacy is not about resting on past success, but about continuing to create value for our clients and societies and moving forward.


Our founding aspiration— roots us in times of change, nurtures our values and sustains our growth, lights the path ahead and fuels the will to move forward.


CEC Line pattern