Taiwan High Speed Rail Project Contract C260

Project Type
Bridge & Road
Location
Changhua County
Year
2004

Architect / Supervising Engineer

BB Engineering, Sinotech Engineering Consultants Ltd. , Maunsell Consultants Asia Ltd.

Client

Taiwan High Speed Rail Corporation

Structure

Reinforced concrete (RC)

Scope of Work

  1. The project starts from Changhua County Fenyuan Township in the north and reaches Xizhou Township in the south, with a total length of 35 km.
  2. Bridge: 25.2 km viaduct
  3. Tunnels: The total length of seven tunnels is 9.41 km

Highlights

  1. The New Austria Tunneling Method (NATM) is adopted for all tunnel projects, including the Baguashan tunnel, which is the longest in the HSR project at 7,360 m.
  2. Bridge construction method: Full Span Precast Launching method (Mainly), balanced cantilever (FCC), precast segmental launching Method, cast-in-situ