Civil Engineering
Taiwan High Speed Rail Project Contract C270
- Project Type
- Bridge & Road
- Location
- Yunlin and Chiayi County
- Year
- 2004

Architect / Supervising Engineer
BB Engineering, Sinotech Engineering Consultants Ltd., Maunsell Consultants Asia Ltd.
Client
Taiwan High Speed Rail Corporation


Structure
Reinforced concrete (RC)
Scope of Work
- The project starts from Changhua Xizhou in the north and reaches Yunlin Tuku in the south, with a total length of 42.5 km
- Bridge structure :41.1 km including the length of the river bridge 5 km
Highlights
Bridge construction method:
Full Span Precast Launching method (Mainly), balanced cantilever (FCC), cast-in-situ