Taiwan Railway Contract C314

Project Type
Tunnel & Underpass
Location
Taitung County
Year
2014

Architect / Supervising Engineer

Sinotech Engineering Consultants Ltd.

Client

Eastern Region Engineering Office, Railway Bureau, Ministry of Transportation and Telecommunications

Scope of Work

  1. Double track railway electrification project from Shanli tunnel to Taidong station, with a total length of 8,210 m
  2. Tunnel: single tube, double track tunnel with a total length of about 5,300 m
  3. Embankment / cut: about 2,760 m in total
  4. Bridge section: precast beam bridge is about 160 m in total