Taichung Elevated Rail Transit Plan Contract CCL331

Project Type
Bridge & Road
Location
Taichung City
Year
2018

Architect / Supervising Engineer

Design: CECI Engineering Consultants Inc.
Supervision:Sinotech Engineering Consultants, Ltd.

Client

Central Region Engineering Office, Railway Bureau,
Ministry of Transportation and Telecommunications

Scope of Work

  1. Elevated railway project of Songzhu Daqing section: a total length of 9.6 km that includes 0.8 km-high transition embankment section and 8.8 km elevated section of 306 piers and columns
  2. 5,601 m prestressed box girder bridge erected span by span in cast-in-situ. Prestressed box girder bridge with full staging method is 1,752 m. The prestressed box girder bridge with balanced cantilever construction method is 1,389 m/Full span precast prestressed beam bridge 43 m
  3. Approach works of railway viaduct: 1 abutment, 547.23 m approach retaining wall and 220 m approach embankment
  4. Auxiliary facilities works related to railway viaduct, such as pre cast guardrail, noise barrier, expansion joint, bridge deck drainage, cable trough and power pole foundation, etc.
  5. Taiyuan Temporary Station project, Taiyuan Temporary Station demolition project and 1,240 m track facilities demolition project in the front and rear sections of Taiyuan Station, Taichung Station and Daqing station